Space Design.
Design that's planned before anything is built
Every project starts with understanding your space, your goals, and your brand, turning requirements into inspired, functional layouts.
From the first Design Brief to the final Design & Costing Sign-Off, our design phase takes about 3 weeks. It’s documented and signed off at every stage, so your design is costed, scheduled for procurement and ready to build before execution begins.
What's in Your Design Package
Conceptualisation
A Design Brief and a ‘Define’ Workshop set the direction, and detailed Workshop Reports capture every requirement.
Space Planning
Site Documentation & Research turns your site conditions and goals into functional layouts.
Visualisation
Two rounds of Design Development refine the concept, from the foundation to the finer details.
Material Selection
Metal, wood, glass, acrylic and veneer, backed by in-house manufacturing and bulk purchasing power.
Costing, Tendering & Procurement
Tendering, a Procurement Schedule, Vendor On-Boarding and a final Design & Costing Sign-Off.
Designed for Every Sector We Serve
- Corporate and IT offices
- Educational institutions
- Healthcare facilities and clinics
- Co-working and co-living operators
- Retail stores and showrooms
- Real estate developers (sales galleries and show flats)
Our Process
1. Discovery
We start with a Design Brief and Site Documentation & Research, understanding your space, goals and site conditions before anything else.
2. Workshop & Concept
A ‘Define’ Workshop shapes the direction, followed by detailed Workshop Reports capturing every requirement.
3. Design Development
Two rounds of Design Development refine the concept. Development I sets the foundation and Development II sharpens the details.
4. Procurement & Sign-Off
Tendering, Procurement Scheduling and the final Design & Costing Sign-Off, with Vendor On-Boarding completing the phase.
Made In-House, Chosen With Care
- Metal, Wood & Glass
- Acrylic & Veneer
- Healthcare facilities and clinics
Different Squares
Why Choose Us ?
- Fixed-budget commitment with transparent costing
- On-time delivery, with a design phase of about 3 weeks
- Creative and innovative design concepts
- In-house manufacturing, so designs are built as drawn
- A streamlined process from consultation to handover
Trusted by the Names That Matter
Pradeep Gaikwad
VP Contracts & Contracts, House of Hiranandani
Their meticulous planning and flawless execution made a world of difference to our projects.
Aditya Dubey
Functional Head – Support Services, Tech Mahindra
A dependable partner who brings creativity and precision to every assignment.
Nitin Dutta
Associate Director, Disney Star
They deliver with such finesse that collaboration feels seamless and results stand out.
Parag Chheda
Joint MD, Prince Pipes & Fitting Ltd.
Consistent quality, timely delivery, and unmatched professionalism—our trusted ally.
M. B. Shankar
Projects Head, Coca Cola
Their ability to translate complex needs into elegant solutions is truly commendable.
Frequently Asked Questions
How long does the design phase take?
Typically 3 weeks, from the initial Design Brief through the final Design & Costing Sign-Off.
What happens during the 'Define' Workshop?
The ‘Define’ Workshop shapes the direction of the design. It’s followed by detailed Workshop Reports that capture every requirement, so the design is built on what you actually need.
How many design iterations do I get?
Two rounds of Design Development. Development I sets the foundation and Development II sharpens the details.
What materials do you work with?
Metal, wood, glass, acrylic, veneer and real wood finishes, supported by our in-house manufacturing.
Do you handle material and vendor procurement too?
Yes. Tendering, Procurement Scheduling and Vendor On-Boarding are part of the design phase, and our bulk purchasing power helps reduce costs without compromising material quality.
What happens after the design is finalised?
Once Design & Costing are signed off, the project moves into execution, which typically takes 8 to 10 weeks. That’s followed by 1 to 2 weeks of post-execution work: snagging, measurement and bill certification, and as-built drawings handover.
Let's Stay in Touch
Updates on our latest work, straight to your inbox.
Different Squares
Building fitouts that inspire since 2007.